Installation, Start Up and Shut Down DF-745 21
e. Use the regulator to adjust the flow through the cell to 1 slpm (2 scfh) as
shown on the flowmeter behind the front door. NOTE: This flow rate may
be reduced to minimize gas consumption but the flow rate will directly
impact the overall system speed of response.
f. Confirm that the needle valve on the vacuum source (aspirator) is fully open
(CCW).
g. Turn on the vacuum source (aspirator) by applying gas to the high pressure
inlet. See Figure 3. (Except when measuring in Helium background which is
not run under vacuum but at ambient)
5. At this point, some adjustment of the aspirator needle valve may be necessary to
achieve the necessary operating cell pressures for each gas (except Helium where
there is no vacuum operation). The proper pressure ranges listed in Table 1 will
automatically appear on the display when the GSF is selected.
Background Gas
Pressure
Vacuum Source
N2
150
-
250 Torr
ON
Ar
280
-
380 Torr
ON
He
740
-
780 Torr
OFF
*
H2
300
-
40
0 Torr
ON
O2
300
-
400 Torr
ON
*A shut off valve must be installed at the inlet to the aspirator to disable the vacuum.
Table 1: Recommended Sample Outlet Vacuum Pressure
4.2.3 Download System Data
The final step of the installation, after a couple days of dry down, should be to download
the system data (see page 65), and send them by e-mail to service@delta-f.com for review.
This will allow the factory to confirm that the analyzer is working properly by comparison
with data stored at the time of shipment, and in addition will set a baseline for comparison
with future downloads, if any.
4.3 Analyzer Shut Down
In order to minimize the time required for the analyzer to re-achieve a zero baseline on start
up, the following steps should be followed when shutting the analyzer down.
Short Term Shut Down - A short-term shut down, for example to move and restart the
analyzer, can be accomplished by simply shutting off the power switch behind the front
door. This action initiates the standard isolation process (for analyzers equipped with gas
control valves) and computer shut down which takes approximately 40 seconds.
Long Term Shut Down For analyzers with gas control valves, from the Main Menu go
to System, and select Isolate Analyzer. A routine automatically starts that closes the
downstream valve and allows pressure to build in the moisture cell after which an upstream