Delta NANOTRACE DF-745 Instruction Manual Page 26

  • Download
  • Add to my manuals
  • Print
  • Page
    / 98
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 25
22 DF-745 Installation, Start Up and Shut Down
valve closes as well. Throughout this process a message appears over the display instructing
the user to wait 40 seconds. Once complete, the message disappears and the user may shut
the power off with the switch behind the front door that initiates the computer shut down
sequence that takes an additional 40 seconds.
Additional long-term isolation security can be achieved by closing the valve on the
rotameter on the rear of the instrument as well as completely closing the sample inlet
regulator.
If the analyzer is being disconnected from gas, be sure to tightly cap all gas connections.
On analyzers that have no gas control valves:
1. Remove the vacuum source.
2. Wait a few minutes to allow positive pressure to build in the moisture cell and
monitor the pressure on the Main Display.
3. Be sure to tightly cap all connections.
NOTE: See the section on Power up Default on page 63 for setting user selectable
preferences at the time of power up.
Loss of power will result in automatic valve closure and the following restoration of power
will result in the “Scan Disk” function occurring before system start-up.
PI
.010 ORIFICE
80 psi IN
TO CREATE VACUUM
MOISTURE
SAMPLE VENT
ASPIRATOR WITH BUILT
IN VACUUM CONTROL
NEEDLE VALVE
MOISTURE SENSOR OUTLET
H O
2
PROCESS INLET
REAR PANEL
FLOW METER
(FRONT)
Figure 9: Block Diagram of Gas Flow Path and Aspriator
Page view 25
1 2 ... 21 22 23 24 25 26 27 28 29 30 31 ... 97 98

Comments to this Manuals

No comments