a
1
2
Step
Screw
(quantity)
Torque
1
M2
×
13
mm,
Silver
(1)
0.294
Nm
(3
kgfcm)
2
M2.0
×
3.5
mm,
Silver
(1)
0.294
Nm
(3
kgfcm)
When
installing:
Attach
the
Ultrabay
Plus
guide
rail
so
that
the
two
small
projections
on
the
ultrabay
device
connector
fit
into
the
holes
a
provided,
and
then
secure
the
screws.
Removing
and
replacing
a
FRU
118
ThinkPad
R40
Comments to this Manuals