Delta 4000 Instruction Manual Page 36

  • Download
  • Add to my manuals
  • Print
  • Page
    / 108
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 35
M
81331 Rev 01 Nov 2010
28
Three winding transformer test
When UST-R is selected for a CHL test, the HV output terminal is to be
connected to the primary winding, the red terminal to the secondary winding and
the blue terminal to the tertiary winding. The blue terminal is in this case
grounded/guarded.
For CHT measurement UST-B should be selected. The blue terminal is now
measured and the red is grounded. The time saving benefit is that the
transformer can be tested without the need for reconnections.
Page view 35
1 2 ... 31 32 33 34 35 36 37 38 39 40 41 ... 107 108

Comments to this Manuals

No comments