Description of Tests
Circuit Breaker Overall Tests
Tests 1 to 6 are conducted with the circuit breaker in the open position. Tests 7
to 9 are conducted with the breaker in the closed position.
Tests 1 to 6 (C
1G
, C
2G
, C
3G
, C
4G
, C
5G
, C
6G
) - These are measurements of the
ground insulation of each pole of the breaker with the breaker in the open
position. Test 1 is indicated by Insulation Tested C
1G
, Test 2 by Insulation
Tested C
2G
, etc. The HV cable is connected to each pole, in turn, with all other
poles floating (no connection). The breaker frame must be connected to station
ground. Test mode is GST-GND.
Test 7 (C
1G
+C
2G
) - This is a measurement of the insulation between Phase 1 (A)
and ground, and is indicated by Insulation Tested C
1G
+C
2G
. This test is
performed with the breaker closed. The HV cable is attached to either Pole 1 or
Pole 2. All other breaker poles are left floating. Test mode is GST-GND.
Test 8 (C
3G
+C
4G
) - This is a measurement of the insulation between Phase 2 (B)
and ground, and is indicated by Insulation Tested C
3G
+C
4G
. This test is
performed with the breaker closed. The HV cable is attached to either Pole 3 or
Pole 4. All other breaker poles are left floating. Test mode is GST-GND.
Test 9 (C
5G
+C
6G
) - This is a measurement of the insulation between Phase 3 (C)
and ground, and is indicated by Insulation Tested C
5G
+C
6G
. This test is
performed with the breaker closed. The HV cable is attached to either Pole 5 or
Pole 6. All other breaker poles are left floating. Test mode is GST-GND.
Bushing and Oil Tests
Tests 10 to 15 - These are tests of the C1 insulation on the breaker bushings.
The HV lead is connected to each bushing top terminal, in turn, and the LV Red
lead is connected to the respective bushing test tap. Test mode is UST - MEAS
RED, GND BLUE. At the completion of each test, the HV and Red leads are
then moved to the next bushing to be tested.
Tests 16 to 21 - These are tests of the C2 insulation on the breaker bushings.
The LV Red lead is connected to each bushing top terminal, in turn, and the HV
lead is connected to the respective bushing test tap. Test mode is GSTg-R. At
the completion of each test, the HV and Red leads are then moved to the next
bushing to be tested.
G
CAUTION
Bushing test taps have very limited insulation and should
generally be energized at reduced voltage levels. If the
bushing or breaker manufacturer does not specify a test
voltage level use no more than 500 volts (0.5kV).