020315 Draft
Following the cleansing and flushing the system MUST be dosed with a good quality water treatment to
prevent corrosion and the formation of scale. FAILURE TO OBSERVE THESE REQUIREMENTS WILL RENDER
THE WARRANTEE ON THE APPLIANCE VOID.
Repeated draining planned or via leaks and refilling of the system, without replenishment of water
treatment, must be avoided, as this is very damaging to the boiler and system components.
Before activating the boiler following the initial installation or hydraulic remedial work on the system,
allow the system to circulate for at least 2 hours with the boiler off. This will allow the system installed
devices to capture/remove any water borne debris. (Micro Air Bubble & Impurity separators.) These
devices must then be cleaned prior to commissioning the boiler. Additional device cleaning may be
required during the first heating cycles.
The system water must have the following characteristics to ensure the long term operation security of
all boiler and system components.
For specific guidance on water treatment, direct contact is advisable with:-
Betz Dearborn Limited
(Sentiel)
Foundry Lane
Widnes
Cheshire
WA8 8UD
Tel: 0151 424 5351
Alpha-Fry Technologies (Fernox)
Cookson Electronics
Forsyth Road
Woking
Surrey
GU21 5RZ
Tel: 0208 665 6666
Care With The Use of Solder Flux
The ProCon MCS range has heat exchangers fabricated from 304L Stainless Steel. It is most important
that the compatibility of any flux is checked with the supplier before use, and that any flux
manufactures recommendations are strictly followed with regards to use in conjunction with Stainless
Steel.
If you are applying any of the ProCon Range to a system where the water quality cannot be cleansed or
treated please consider installing a system separation plate heat exchanger to ensure absolute
separation of the system water and the boiler water.
Please refer to our website for further details on our matched brazed and gasketed plate heat exchanger
range.