Delta DVP-ES2 User Manual Page 567

  • Download
  • Add to my manuals
  • Print
  • Page
    / 702
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 566
3. Instruction Set
3-451
Freq.
Time
Gap freq.
Delayed by program scan cycle
Gap
time
Gap
time
Change target freq.
Actual timing of changing
2. If users change the target frequency by applying DICF instruction in insterupt subroutines, the
actual changing timing will be executed immediately with only an approx. 10us delay
(execution time of DICF instruction).
The timing diagram is as below:
Freq.
Time
Gap freq.
approx.10us
Gap
time
Gap
time
Interrupt
A
ctual timing of changing
Program Example:
1. When M0 = ON, pulse output ramps up to 100kHz. Total shifts: 100, Gap frequency: 1000Hz,
Gap time: 10ms. Calculation of total shifts: (100,000 0) ÷ 1000 = 100.
2. When X6 external interrupt executes, target frequency is changed and ramp down to 50kHz
immediately. Total shifts: 150, Gap frequency: 800Hz, Gap time: 20ms. Calculation of total
shifts: (100,000 50,000) ÷ 800 = 125
3. When X7 external interrupt executes, target frequency is changed and ramp down to 100Hz
immediately. Total shifts: 25, Gap frequency: 2000Hz, Gap time: 100ms. Calculation of total
shifts: (50,000 100) ÷ 2000 = 25.
4. When pulse output reaches 100Hz, the frequency is kept constant and pulse output stops
when 1,000,000 pulses is completed.
Page view 566
1 2 ... 562 563 564 565 566 567 568 569 570 571 572 ... 701 702

Comments to this Manuals

No comments