Delta PG-30 Installation Manual Page 7

  • Download
  • Add to my manuals
  • Print
  • Page
    / 50
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 6
SECTION 1: SPECIFICATION INFORMATION
SPECIFICATIONS
2
Delta 1200
OPERATING CAPACITY (RACKS/HOUR)
GLASSES PER HOUR 1200
OPERATING CYCLE (SECONDS)
TOTAL CYCLE TIME 120
TANK CAPACITY (GALLONS) 3.0
WASH PUMP CAPACITY
WASH PUMP 55 GPM
TEMPERATURES
WASH---°F (MINIMUM) 130
RINSE---°F (MINIMUM) 75
ELECTRICAL REQUIREMENTS
WASH PUMP MOTOR HORSEPOWER 1/10
NOTE: Typical Electrical Circuit is based upon (1) 125% of the full amperage load of the machine and (2) typical fixed-
trip circuit breaker sizes as listed in the NEC 2002 Edition. Local codes may require more stringent protection than
what is displayed here. Always verify with your electrical service contractor that your circuit protection is adequate
and meets all applicable national and local codes. These numbers are provided in this manual simply for reference
and may change without notice at any given time.
RINSE TYPICAL
HEATER TOTAL ELECTRICAL
VOLTS PH HZ RATINGS AMPS CIRCUIT
208 1 60 220V/3KW 15A 15A
230 1 60 220V/3KW 15A 15A
WATER REQUIREMENTS
INLET TEMPERATURE 130°F
GALLONS PER HOUR 10.0
WATER LINE SIZE NPT (Minimum) 1/2”
DRAIN LINE SIZE NPT (Minimum) 1-1/2”
FLOW PRESSURE P.S.I. 20±5
MINIMUM CHLORINE REQUIRED (PPM) 50
MINIMUM IODIPHOR REQUIRED (PPM) 12.5
NOTE: Always refer to the machine data plate for specific electrical and water requirements. The material provided on
this page is for reference only and may be subject to change without notice.
Page view 6
1 2 3 4 5 6 7 8 9 10 11 12 ... 49 50

Comments to this Manuals

No comments