Delta 48313 Installation Manual Page 12

  • Download
  • Add to my manuals
  • Print
  • Page
    / 78
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 11
E.
F.
Slide O-ring (1) over cartridge and the
bonnet nut (2). The O-ring, which acts as
a spacer to steady the sleeve, should rest
behind the bonnet nut.
Slide the sleeve (1) over the cartridge,
body and O-ring. Ensure sleeve is properly
positioned over the front of cartridge.
18 Series Installation - Single Unit
1
2
1
For back to back or reverse installations
(hot on right and cold on left): Rotate
cartridge (1) so the words “HOT SIDE” (2)
appear on the right. Install the cartridge
Back to back Installation
Reverse
Installation
Cold
Hot
1
3
making sure that the key is fully engaged
with the slot in the brass body (see step D).
Slide bonnet nut (3) over the cartridge and
thread onto the body. Hand tighten securely.
Cartridge Installation
10
2
Normal Installation
(changes not required)
Page view 11
1 2 ... 7 8 9 10 11 12 13 14 15 16 17 ... 77 78

Comments to this Manuals

No comments