Delta 48313 Installation Manual Page 19

  • Download
  • Add to my manuals
  • Print
  • Page
    / 78
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 18
B.
1
4
4
2
3
18T Series Installation
2
Cartridge Installation
A.
Turn off water supplies. Remove
cover (1), bonnet nut (2) and test cap (3)
from the body. If this is not a thin wall
mounting, the entire plasterguard (4)
may be removed. If screen (5) is in place,
remove before installing cartridge.
1
2
3
17
C.
Slide bonnet nut (1) over the cartridge
and thread onto the body. Hand tighten
securely.
1
4
Rotate the cartridge (1) so the word
“UP” (2) appears on the top. Insert
cartridge into valve body as shown. Make
sure the cartridge tubes and O-rings (3)
are properly seated in holes at the base of
the body. Ensure the keys on the body are
fully engaged with the slots in the body (4).
For back to back or reverse installations (hot
on right and cold on left): Rotate cartridge (1)
so the word “UP” (2) appears on the bottom.
Install the cartridge making sure that the
keys are fully engaged with the slot in the
brass body (see step B). Slide bonnet nut (3)
over the cartridge and thread onto the body.
Hand tighten securely.
Back to back Installation
Normal Installation
(changes not required)
Reverse
Installation
Cold
Hot
1
3
2
5
Page view 18
1 2 ... 14 15 16 17 18 19 20 21 22 23 24 ... 77 78

Comments to this Manuals

No comments