Delta SoLiViA 3.3 Installation Manual Page 13

  • Download
  • Add to my manuals
  • Print
  • Page
    / 48
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 12
EN
13Operation and installation manual SOLIVIA 3.3 AP G3 TR
length, cable cross-section).
The recommended installation position is to be adhered to (vertical).
Unused DC connectors and interfaces must be sealed airtight with sealing plugs to
ensure protection class IP65 for the whole system (inverter & cables).
50 cm
10 cm
50 cm
10 cm
Wall
Wall
7.3 Maintenance
Make sure that the device remains uncovered while in operation. To avoid the casing of
the solar inverter becoming soiled, it should be cleaned periodically.
User serviceable parts are not contained in the device. Under no circumstances should
the solar inverter be opened!
7.4 Installation
You should utilize the delivered mounting plate for problem-free installation of the solar
inverter. Installation to the wall should be implemented with the proper screws. Mount
the wall bracket so that the solar inverter only has to be simply attached. After that, the
device is to be bolted on securely.
Assembly instructions
1. Mount the mounting plate with appropriate screws (max. Ø 6mm) into at least four
of the eight holes to x the wall bracket in place. You can employ the mounting
plate as a template for marking the positions of the boreholes.
2. As the solar inverter weighs 21.5 kg, it should be lifted out of the transport crate by
at least two persons.
3. Place the solar inverter onto the mounting plate with at least two persons.
4. Fasten the supplied mounting nuts and washers on the threaded bolt intended for
securing the device.
5. Check that the solar inverter is securely sealed.
Page view 12
1 2 ... 8 9 10 11 12 13 14 15 16 17 18 ... 47 48

Comments to this Manuals

No comments