The terminal markings in the Zenith ATS are marked “X1” and
“X2”. The wire labeled “Start 1” is routed to start contact "X1” and
the wire labeled “Start 23” is routed to start contact “X2”
ASCO 165 UL SWITCH
Your DC connection points in the ASCO 165 ATS are
terminals “4” and “5 on the interface terminal block.
ASCO 300 UL SWITCH
Your DC connection points in the ASCO 300 ATS are terminals
“14” and “15”. Depending on the size of the switch they are
located in different locations.
INITIAL START UP
****************
***** WARNING *****
****************
EQUIPMENT DAMAGE - DO NOT jump start these engine
generator sets. Starting these units on a low battery or jump
starting them will cause damage to the engine control module.
Use the following check list to verify correct installation before
starting the engine:
1. Engine oil. Fill as required with proper grade/qty.
2. Engine coolant. Fill as required with proper
mixture.
3. Unit mounting base properly bolted down.
4. Clearance for service and maintenance on all
sides.
5. Proper fuel line material and size.
6. All fuel line connections tight.
7. Fuel line protected and a moisture trap installed
(may be required for N.G.).
8. Correct LP/NG pressure 4-6 Oz. (7-11" Wc).
9. Battery connections clean and tight.
10. Battery fully charged.
11. All AC and DC wiring installed and properly
protected.
After completing the above checklist, the engine-generator set is
ready for the initial start-up test.