1285-00
60708-153
The generator set can be lifted with properly rated chains or cables
along with the use of spreader bars. The spreader bars should be
long enough so that the lift cables or chains do not come into con-
tact with the generator set. Use of commercially available lifting
fixtures may also be used. Always be sure that the equipment is
properly rated for the weight of the generator. Failure to do so can
cause damage to the generator, injury to personnel or even death.
Depending on generator set size and configuration, the exhaust
system may ‘ship loose’ with the generator set for installation on
site. The muffler and its attaching brackets must be mounted on
top of the generator housing prior to operating the engine
generator set.
INSTALLATION
***************
***** WARNING ****
***************
PERSONAL INJURY - Before proceeding with the installation,
be sure the DSE7X10 is in the "stop" position. Before
proceeding with the installation, be sure the Generator MLCB
(Main Line Circuit Breaker) is in the ‘OFF’ position and the
unit starting battery is disconnected.
GENERAL INFORMATION
These engine/generator sets are generally supplied as weather
enclosed packages for quick installation on an outdoor concrete
pad. They are also available as open skid mounted units for indoor
installation in a building or protective enclosure supplied by the
installer. The factory weather enclosures are available as standard
or acoustical housing intended for outdoor installation only. Factory
weather enclosed units are not intended to be used indoors and
no support is available to assist in re-engineering finished
packaged units.
All versions must be bolted to a solid base for proper operation. A
properly designed concrete pad is necessary for stationary opera-
tion. A substantial DOT certified trailer is required for mobile appli-
cations. Consult a qualified, licensed electrician or contractor to
install and wire this Generator Set. The installation must comply
with all national, state, and local codes.
Before beginning the installation process, recheck the voltage,
phase and amperage rating of the Generator Set and ATS (Auto-
matic Transfer Switch). Be certain they can handle the intended load
and are compatible with the entrance voltage, phase and current
ratings. Plans for installation should be prepared with proper
attention to mechanical and electrical engineering detail to assure a
satisfactory system installation.
The information in this manual is offered only as a guide to finalizing
your installation plans.
NOTICE
For full service switching of the entire load, the ATS must be ‘SE’
(Service Entrance) rated or must have a properly rated fusible
disconnect installed before the ATS to protect the contacts
.
.
ENGINE GENERATOR SET MOUNTING
The unit’s main frame must be bolted solidly to a 4 to 6 inch thick
cement pad. The engine-generator is mounted on a sub-frame
which is attached with special shock mounts to the main frame.
This allows the engine-generator free movement without affecting
the control panel which is mounted on the main frame.