M
81331 Rev 01 Nov 2010
68
Description of Tests
Circuit Breaker Overall Tests
Prior to the overall insulation tests, remove the breaker from its cubicle or cell, if
applicable.
The breaker will remain in the open position for all tests.
Tests 1 to 6 (C
1G
, C
2G
, C
3G
, C
4G
, C
5G
, C
6G
) - These are measurements of the
ground insulation of each pole of the breaker with the breaker in the open
position. Test 1 is indicated by Insulation Tested C
1G
, Test 2 by Insulation
Tested C
2G
, etc. The HV cable is connected to each pole, in turn, with all other
poles floating (no connection). The breaker frame must be connected to station
ground. Test mode is GST-GND.
Test 7 (C
12
) - This is a measurement of the insulation between the poles on
Phase 1 or Phase A, and is indicated by Insulation Tested C
12
. The HV cable is
attached to Pole 1 and the LV Red lead is attached to Pole 2. All other breaker
poles are left floating. This test is performed with the breaker open. Test mode
is UST-R.
Test 8 (C
34
) - This is a measurement of the insulation between the poles on
Phase 2 or Phase B, and is indicated by Insulation Tested C
34
. The HV cable is
attached to Pole 3 and the LV Red lead is attached to Pole 4. All other breaker
poles are left floating. This test is performed with the breaker open. Test mode
is UST-R.
Test 9 (C
56
) - This is a measurement of the insulation between the poles on
Phase 3 or Phase C, and is indicated by Insulation Tested C
56
. The HV cable is
attached to Pole 5 and the LV Red lead is attached to Pole 6. All other breaker
poles are left floating. This test is performed with the breaker open. Test mode
is UST-R.
Bushing Tests
Most vacuum circuit breakers are not supplied with condenser bushings, except
for those rated above 15kV.
The table supplied may be used to measure the C1 insulation on condenser
bushings, if so equipped. For all tests, test mode is UST-R.