81331 Rev 01 Nov 2010
64
Description of Tests
Circuit Breaker Overall Tests
Test 1 (C
1G
) - This is a measurement of the ground insulation on Pole 1 with the
circuit breaker in the open position. All other poles on the breaker will be
floating (no connection). The HV cable will be connected to the bushing top
terminal. No LV lead connection is required. The frame of the breaker must be
connected to station ground. Test mode is GST-GND.
Test 2 (C
2G
) - This is a measurement of the ground insulation on Pole 2 with the
circuit breaker in the open position. All other poles on the breaker will be
floating (no connection). The HV cable will be connected to the bushing top
terminal. No LV lead connection is required. The frame of the breaker must be
connected to station ground. Test mode is GST-GND.
Test 3 (C
3G
) - This is a measurement of the ground insulation on Pole 3 with the
circuit breaker in the open position. All other poles on the breaker will be
floating (no connection). The HV cable will be connected to the bushing top
terminal. No LV lead connection is required. The frame of the breaker must be
connected to station ground. Test mode is GST-GND.
Test 4 (C
4G
) - This is a measurement of the ground insulation on Pole 4 with the
circuit breaker in the open position. All other poles on the breaker will be
floating (no connection). The HV cable will be connected to the bushing top
terminal. No LV lead connection is required. The frame of the breaker must be
connected to station ground. Test mode is GST-GND.
Test 5 (C
5G
) - This is a measurement of the ground insulation on Pole 5 with the
circuit breaker in the open position. All other poles on the breaker will be
floating (no connection). The HV cable will be connected to the bushing top
terminal. No LV lead connection is required. The frame of the breaker must be
connected to station ground. Test mode is GST-GND.
Test 6 (C
6G
) - This is a measurement of the ground insulation on Pole 6 with the
circuit breaker in the open position. All other poles on the breaker will be
floating (no connection). The HV cable will be connected to the bushing top
terminal. No LV lead connection is required. The frame of the breaker must be
connected to station ground. Test mode is GST-GND.
Test 7 (C
12
) - This is a measurement of the insulation on Phase 1 (A) between
Pole 1 and Pole 2 with the circuit breaker in the open position. All other poles
on the breaker will be floating (no connection). The HV cable will be connected
to the bushing top terminal of either Pole 1 or 2. The LV Red lead is connected
to the other Pole. The frame of the breaker must be connected to station
ground. Test mode is UST-R.