1. Remove all wiring and links from the soft starter before dismantling the unit.
2. Remove the unit cover (4 screws).
3. Unscrew the main plastic and fold away from the starter (4 screws).
4. Unplug the keypad loom from CON 1 (see note).
5. label each SCR firing loom with the number of the corresponding terminal on
the main control PCB, then unplug the looms.
6. Unplug the thermistor, fan and CT wires from the main control PCB.
NOTE
Remove the main plastic slowly to avoid damaging the keypad wiring loom which runs between the main plastic and the
backplane PCB.
1. Unscrew and remove the magnetic bypass plates (models MCD5-0620C to
MCD5-1600c ONLY).
2. Remove the CT assembly (three screws).
3. Identify which bus bars are to be moved. Remove the bolts holding these bus
bars in place then slide the bus bars out through the bottom of the starter (four
bolts per bus bar).
1. Slide the bus bars in through the top of the starter. For input bus bars, the short
curved end should be outside the starter. For output bus bars, the unthreaded
hole should be outside the starter.
2. Replace the dome washers with the flat face towards the bus bar, then tighten
the bolts holding the bus bars in place to 20 Nm.
3. Place the CT assembly over the input bus bars and screw the assembly to the
body of the starter (see note).
4. Run all wiring to the side of the starter and secure with cable ties.
Bus Bar Adjustment Procedur... MCD 500 Operating Instruction
74 MG.17.K3.02 - VLT
®
is a registered Danfoss trademark
1111
Page view 74
1 2 ... 70 71 72 73 74 75 76 77

Comments to this Manuals

No comments